Wykonanie instalacji elektrycznej

Zdjęcie 17.10.2022, 12 53 57.jpg

Adaptation

The first step in installing a parcel locker is preparing a suitable site for its installation.

Site adaptation includes selecting a location that is easily accessible for customers and meets all logistical and technical requirements.

Next, the team responsible for installing the parcel locker carries out groundwork, such as leveling the area or digging, to prepare the foundation for the device.

Depending on the needs, additional work may be necessary, such as building a sidewalk or securing the area against erosion.

Zdjęcie 17.10.2022, 17 13 09.jpg

Electricity

The second step is the implementation of the electrical installation, which will provide power to the parcel locker.

The electrician performs all necessary tasks related to the distribution of power cables and electrical safety measures. If external lighting is to be installed, it is also done at this stage.

Electrical work must be carried out in accordance with current standards and regulations to ensure the safe use of the parcel locker.

Zdjęcie 17.10.2022, 17 13 09.jpg

Parcel Locker Installation

The final step is the actual installation of the parcel locker. Installation specialists deliver all necessary parcel locker components and tools needed for assembly to the site.

The installation is carried out according to the manufacturer's instructions and technical requirements, which includes both the installation of the device and its connection to the electrical system.

After completing the installation work, the parcel locker is tested for proper functioning and user safety. The installation team also performs minor finishing and cleaning work around the parcel locker.